翻訳と辞書
Words near each other
・ Karuvannoor
・ Karuvannur River
・ Karuvanthuruthy
・ Karuvarai Pookkal
・ Karuvarakundu
・ Karuvatta
・ Karuvelam Pookkal
・ Karuwalagahadewala
・ Karuwalagaswewa Divisional Secretariat
・ Karuwalakelewatta
・ Karuwalakelle
・ Karuyeh
・ Karuz
・ Karun, Mazandaran
・ Karun-3 Dam
Karun-4 Dam
・ Karuna
・ Karuna (film)
・ Karuna Banerjee
・ Karuna Bhattacharya
・ Karuna Center for Peacebuilding
・ Karuna Cheyvan Enthu
・ Karuna Church
・ Karuna Gopal
・ Karuna Medical College
・ Karuna Ratna Tuladhar
・ Karuna Shukla
・ Karuna Supreme
・ Karuna Trust
・ Karuna Trust (India)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Karun-4 Dam : ウィキペディア英語版
Karun-4 Dam

The Karun-4 Dam is an arch dam on the Karun River located at 180 km southwest of Shahr-e-Kord in the province of Chaharmahal and Bakhtiari, Iran. The Karun has the highest discharge of all the Iranian rivers.〔(【引用サイトリンク】title=Dam history )〕 Its construction is aimed at electric power supply of 2107 million kWh annually and controlling floods in the upper Karun.
The dam is a concrete double curvature arch-type and high from the foundation.〔 The arch dam design is an ideal one for a dam built in a narrow, rocky gorge to hold back water in a reservoir. The dam is curved. Because of the arch shape, the force of the backed up water presses downward against the dam and has the effect of strengthening the dam foundation. The dam withholds a reservoir with a surface area of and capacity of .〔(【引用サイトリンク】title=Dam basics )
The dam's first study was conducted in 1995 and river diversion began in 1997. Concrete pouring began in 2006 and the power plant began producing electricity in November 2010.〔http://english.irib.ir/index.php/news/political/32317-karoun-4-dam-launched-into-operation〕〔http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=33〕 On December 11, 2010, the second generator for the dam became operational and was connected to the grid. The dam will eventually have an installed capacity of 1,020 MW.〔(【引用サイトリンク】url=http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=94 )〕 The dam was inaugurated on 6 July 2011 by Iranian President Mahmood Ahmadinejad.〔(【引用サイトリンク】url=http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=117 )
==Objectives==
It was built to fulfill the followings:
*To produce an average annual hydropower energy as much as 2100 GW-h.
*To join the cascade dams on the Karun River, hence regulate the flow in order to supply the water required by the industry and agriculture downstream.
*To control the destructive floods of the Karun River.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Karun-4 Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース